Ascending - have both tethers the same length

 

When you’re setting up your tethers and jumars for ascending a rope, getting the correct length for the tethers is critical. If it’s too short you’ll be making short, choppy, and efficient strokes. If it’s too long, you can’t easily reach your upper ascender from the rest position, and you’ll flame out your arms and abs in a few minutes. 

(You may want slight variations on this “ideal” length. For lower angled slab pitches, you might want the tether a bit shorter; for steeper pitches, maybe a bit longer. But you do need a starting point.)

Here are a few guidelines for getting the tether length set correctly.

  • With the tethers girth hitched to your belay loop or tie in points (there are pros and cons to both, see below), pull the daisy tethers up vertically in front of you.

  • The bottom of the locking carabiner should be just about at the middle of your forehead. (See photo below)

  • Now, clip the ascender to your fixed rope and put full body weight on it. If you reach straight up, your wrist should be at the top of the ascender. This positioning ensures that you have a gentle bend in your elbow when your hand is grabbing the handle, and you can easily reach the trigger on the cam. Take the time to get this right. (It’s been my experience that most new aid climbers initially make their tether too long.)

  • Tip - Once you determine the correct connection length, mark this on your tethers. If you have adjustables, add a Sharpie pen mark. If you have traditional sewn pocket daisies, add a loop of 2mm or so cord or stout string (or burly tape like hockey tape) to the correct loop to mark it. By doing this, you set it once, and you can quickly adjust it to the right spot anytime in the future.


Big wall ace Mark Hudon shared a good tip with me. Most people think only your dominant hand tether needs to be the perfect length, and the length of the other one doesn’t really matter.  

Mark says: have them both at the same length.

Reason: When ascending, whatever way the route goes, you should lead with that hand. Say that you’re right handed. If the pitch goes pretty much straight up or to the right, you’ll be leading with your right ascender. But, if the pitch leads to the left, you should be leading with your left hand ascender. In that case, the tether length should be the same as the right. 

 

Here’s a photo of the proper set up. See that the bottom of the carabiner is just about at the climber’s forehead? When weighted on the rope, it should settle into the correct position.

aid climbing tether length for seconding.JPG

So, where to attach the daisies to your harness, the tie in points or the belay loop? Both locations have pros and cons. (The front of your harness is going to be a clustered junk show no matter what you do, so get used to it.) Try both and see what you like. If you want to take a deep dive into this, check out this article.

  • Tie in points: redundancy, gets you closer to the gear and thus higher in your aiders (if you have an adjustable tether), but can be uncomfortable as it’s squeezing your groin as your tie in points are smushed together, like you just took a fall.

  • Belay loop: more comfortable, can be redundant if you have a harness with two belay loops, puts you farther from placed gear.

 
Previous
Previous

Big wall bucket - 5 gallons of stout storage

Next
Next

Clip like size cams together